Owen Chapman's Gallery
NLSME 2008
2nd March 2008 to 30th December 2008

This years collection

<-- Index | Showing 1-60 of 273 pictures | Next -->
Before the running seasion starts we see the ground level has extended beyond last years end of track onto the new land
Before the running seasion starts we see the ground level has extended beyond last years end of track onto the new land
2008-03-02 10:55:33
It then swings around the bottom loop on the mainlin and past signal 10
It then swings around the bottom loop on the mainlin and past signal 10
2008-03-02 10:57:57
A deviation on the mail line is also progressing at great speed to avoide some of the ever expanding trees
A deviation on the mail line is also progressing at great speed to avoide some of the ever expanding trees
2008-03-02 11:17:53
The sweeping curves of the deviation can be seen in relation to the old line, still mostly in place.
The sweeping curves of the deviation can be seen in relation to the old line, still mostly in place.
2008-03-02 11:19:00
By the waterboard boundry fence the ground level decends a fearsome 1:70 behind Rebekahs mound
By the waterboard boundry fence the ground level decends a fearsome 1:70 behind Rebekahs mound
2008-03-02 11:49:44
From the opersite side of the tracks looking towards the heath
From the opersite side of the tracks looking towards the heath
2008-03-02 11:49:58
Lower down the grade earth works have been nesersary to keep the gradient constant
Lower down the grade earth works have been nesersary to keep the gradient constant
2008-03-02 11:50:36
The greatest extremity of the line a great curve is marked out partially in a cutting
The greatest extremity of the line a great curve is marked out partially in a cutting
2008-03-02 11:51:00
Looking back up the gradient towards the parrallel
Looking back up the gradient towards the parrallel
2008-03-02 11:51:20
Looking back to the waterworks the new line curves round the mound
Looking back to the waterworks the new line curves round the mound
2008-03-02 11:52:07
The current end of track, with the other end just visible beyond the barrow
The current end of track, with the other end just visible beyond the barrow
2008-03-02 11:52:15
A bit further round showing the course the line willtake very soon. The Mainline will eventually be extended and run onto the embankment on the right, through the mound.
A bit further round showing the course the line willtake very soon. The Mainline will eventually be extended and run onto the embankment on the right, through the mound.
2008-03-02 11:52:38
From the top of the mound the other line curving round from the main line.
From the top of the mound the other line curving round from the main line.
2008-03-02 11:54:29
Looking back to the parallel section
Looking back to the parallel section
2008-03-02 11:54:36

2008-03-02 11:55:24

2008-03-02 12:01:25

2008-03-02 12:01:31

2008-03-02 12:04:46
From one of my faviourate locations showing the new track. Signal 10 is normally located here
From one of my faviourate locations showing the new track. Signal 10 is normally located here
2008-03-02 12:05:03
From the mail line looking towards Rebekahs mound.
From the mail line looking towards Rebekahs mound.
2008-03-02 12:05:56
A closer look at the work on the mainline
A closer look at the work on the mainline
2008-03-02 12:08:37
Mike dose some mortaring
Mike dose some mortaring
2008-03-02 12:10:06
From the workshop the course the new curves will take. This area was trechourus before, starting from the steaming bays, but now the curves are tighter...........
From the workshop the course the new curves will take. This area was trechourus before, starting from the steaming bays, but now the curves are tighter...........
2008-03-02 12:13:27
Dick has repainted 4300
Dick has repainted 4300
2008-05-11 15:55:00
Brian and his 4-4-0 dig in on the new deviation
Brian and his 4-4-0 dig in on the new deviation
2008-05-11 15:57:00
4300 leaves the station area
4300 leaves the station area
2008-05-11 15:58:00
Dick storming the new section with gustow. Tony can be seen heading away from the station a behind
Dick storming the new section with gustow. Tony can be seen heading away from the station a behind
2008-05-11 16:08:00
The ground level is now a compleat track, if still to be landscape. Peter takes the DeWinton for a test run down the steep bank
The ground level is now a compleat track, if still to be landscape. Peter takes the DeWinton for a test run down the steep bank
2008-05-11 16:11:00
Rounding the mound the efford can just be detected in the grey exhaulst as the new line climbs away from the boundry
Rounding the mound the efford can just be detected in the grey exhaulst as the new line climbs away from the boundry
2008-05-11 16:12:00
A close up of the Dewinton in motion just behind signal 10 on the main line
A close up of the Dewinton in motion just behind signal 10 on the main line
2008-05-11 16:12:00
A view up the cutting from the bottom of the bbank
A view up the cutting from the bottom of the bbank
2008-05-11 16:27:00
Peter again behind the mound
Peter again behind the mound
2008-05-11 16:28:00
Having climbed round the mound the new line paralells itself and the bottom loop of the raised track
Having climbed round the mound the new line paralells itself and the bottom loop of the raised track
2008-05-11 16:29:00
Comeing off the new land back into the long narrows
Comeing off the new land back into the long narrows
2008-05-11 16:29:00
The DeWinton is parked smoking up onnthe cockoo line by the lake
The DeWinton is parked smoking up onnthe cockoo line by the lake
2008-05-11 16:34:00
The DeWinton from the driving position
The DeWinton from the driving position
2008-05-11 16:35:00
Another look of smoke over the lake and boaters
Another look of smoke over the lake and boaters
2008-05-11 16:37:00
Chief civil engineer on the deviation Mike enjoys the fruites of his labours setting his V3 with a heavy party train at the reverse curves
Chief civil engineer on the deviation Mike enjoys the fruites of his labours setting his V3 with a heavy party train at the reverse curves
2008-05-17 15:35:39
Working hard turning back toward the original route
Working hard turning back toward the original route
2008-05-17 15:35:44
Mike and Paul share duties running their B1
Mike and Paul share duties running their B1
2008-05-17 15:37:15
Mike on the deviation again
Mike on the deviation again
2008-05-17 15:43:10
Peter takes a break from encouraging funny business in the tunnel
Peter takes a break from encouraging funny business in the tunnel
2008-05-17 16:27:22
Les has a go with Marrie E
Les has a go with Marrie E
2008-05-18 15:27:08
The closness of the new line can be seen with Derick by the station starting signal 1
The closness of the new line can be seen with Derick by the station starting signal 1
2008-05-18 15:30:56
Gauge one Tony has become 5'' Tony with his acquisition of this super Maid of Kent
Gauge one Tony has become 5'' Tony with his acquisition of this super Maid of Kent
2008-05-18 15:31:35
Tony concentrates hard with the 4-4-0 climbing the deviation
Tony concentrates hard with the 4-4-0 climbing the deviation
2008-05-18 15:33:13
Seconds later Marrie E passes by as she leaves the station, Tony hurtles on behind
Seconds later Marrie E passes by as she leaves the station, Tony hurtles on behind
2008-05-18 15:33:16
Tony G leaves the station
Tony G leaves the station
2008-05-18 17:00:36
Anotjer view of the reguvinated 4300
Anotjer view of the reguvinated 4300
2008-05-18 17:02:40
Tony Gs 4-4-0 has this sweat working water pump on the running board
Tony Gs 4-4-0 has this sweat working water pump on the running board
2008-05-18 17:14:31
This Sweat Pea payed the new ground level a visit and is hear climbing hard round the mound from a main line train at signal 10
This Sweat Pea payed the new ground level a visit and is hear climbing hard round the mound from a main line train at signal 10
2008-05-25 14:58:22
Even Tony D is at it with his camera watching Jim round the mound
Even Tony D is at it with his camera watching Jim round the mound
2008-05-25 14:58:48
Jim from a raised track train in the long narrows
Jim from a raised track train in the long narrows
2008-05-25 14:59:25
Jim races the raised track pasted the water trough site
Jim races the raised track pasted the water trough site
2008-05-25 15:13:51
Jim climbs away from the mound ..
Jim climbs away from the mound ..
2008-05-25 15:15:53
..also seen from the raised track
..also seen from the raised track
2008-05-25 15:16:03
The height of the exhaulst shows Jims effort on the new line
The height of the exhaulst shows Jims effort on the new line
2008-05-25 15:16:07
Through the long narrows
Through the long narrows
2008-05-25 15:17:46
Jim climbs up past the carpark
Jim climbs up past the carpark
2008-05-25 15:29:05

2008-05-25 15:43:06