Before the running seasion starts we see the ground level has extended beyond last years end of track onto the new land 2008-03-02 10:55:33 |
It then swings around the bottom loop on the mainlin and past signal 10 2008-03-02 10:57:57 |
A deviation on the mail line is also progressing at great speed to avoide some of the ever expanding trees 2008-03-02 11:17:53 |
The sweeping curves of the deviation can be seen in relation to the old line, still mostly in place. 2008-03-02 11:19:00 |
By the waterboard boundry fence the ground level decends a fearsome 1:70 behind Rebekahs mound 2008-03-02 11:49:44 |
From the opersite side of the tracks looking towards the heath 2008-03-02 11:49:58 |
Lower down the grade earth works have been nesersary to keep the gradient constant 2008-03-02 11:50:36 |
The greatest extremity of the line a great curve is marked out partially in a cutting 2008-03-02 11:51:00 |
Looking back up the gradient towards the parrallel 2008-03-02 11:51:20 |
Looking back to the waterworks the new line curves round the mound 2008-03-02 11:52:07 |
The current end of track, with the other end just visible beyond the barrow 2008-03-02 11:52:15 |
A bit further round showing the course the line willtake very soon. The Mainline will eventually be extended and run onto the embankment on the right, through the mound. 2008-03-02 11:52:38 |
From the top of the mound the other line curving round from the main line. 2008-03-02 11:54:29 |
Looking back to the parallel section 2008-03-02 11:54:36 |
2008-03-02 11:55:24 |
2008-03-02 12:01:25 |
2008-03-02 12:01:31 |
2008-03-02 12:04:46 |
From one of my faviourate locations showing the new track. Signal 10 is normally located here 2008-03-02 12:05:03 |
From the mail line looking towards Rebekahs mound. 2008-03-02 12:05:56 |
A closer look at the work on the mainline 2008-03-02 12:08:37 |
Mike dose some mortaring 2008-03-02 12:10:06 |
From the workshop the course the new curves will take. This area was trechourus before, starting from the steaming bays, but now the curves are tighter........... 2008-03-02 12:13:27 |
Dick has repainted 4300 2008-05-11 15:55:00 |
Brian and his 4-4-0 dig in on the new deviation 2008-05-11 15:57:00 |
4300 leaves the station area 2008-05-11 15:58:00 |
Dick storming the new section with gustow. Tony can be seen heading away from the station a behind 2008-05-11 16:08:00 |
The ground level is now a compleat track, if still to be landscape. Peter takes the DeWinton for a test run down the steep bank 2008-05-11 16:11:00 |
Rounding the mound the efford can just be detected in the grey exhaulst as the new line climbs away from the boundry 2008-05-11 16:12:00 |
A close up of the Dewinton in motion just behind signal 10 on the main line 2008-05-11 16:12:00 |
A view up the cutting from the bottom of the bbank 2008-05-11 16:27:00 |
Peter again behind the mound 2008-05-11 16:28:00 |
Having climbed round the mound the new line paralells itself and the bottom loop of the raised track 2008-05-11 16:29:00 |
Comeing off the new land back into the long narrows 2008-05-11 16:29:00 |
The DeWinton is parked smoking up onnthe cockoo line by the lake 2008-05-11 16:34:00 |
The DeWinton from the driving position 2008-05-11 16:35:00 |
Another look of smoke over the lake and boaters 2008-05-11 16:37:00 |
Chief civil engineer on the deviation Mike enjoys the fruites of his labours setting his V3 with a heavy party train at the reverse curves 2008-05-17 15:35:39 |
Working hard turning back toward the original route 2008-05-17 15:35:44 |
Mike and Paul share duties running their B1 2008-05-17 15:37:15 |
Mike on the deviation again 2008-05-17 15:43:10 |
Peter takes a break from encouraging funny business in the tunnel 2008-05-17 16:27:22 |
Les has a go with Marrie E 2008-05-18 15:27:08 |
The closness of the new line can be seen with Derick by the station starting signal 1 2008-05-18 15:30:56 |
Gauge one Tony has become 5'' Tony with his acquisition of this super Maid of Kent 2008-05-18 15:31:35 |
Tony concentrates hard with the 4-4-0 climbing the deviation 2008-05-18 15:33:13 |
Seconds later Marrie E passes by as she leaves the station, Tony hurtles on behind 2008-05-18 15:33:16 |
Tony G leaves the station 2008-05-18 17:00:36 |
Anotjer view of the reguvinated 4300 2008-05-18 17:02:40 |
Tony Gs 4-4-0 has this sweat working water pump on the running board 2008-05-18 17:14:31 |
This Sweat Pea payed the new ground level a visit and is hear climbing hard round the mound from a main line train at signal 10 2008-05-25 14:58:22 |
Even Tony D is at it with his camera watching Jim round the mound 2008-05-25 14:58:48 |
Jim from a raised track train in the long narrows 2008-05-25 14:59:25 |
Jim races the raised track pasted the water trough site 2008-05-25 15:13:51 |
Jim climbs away from the mound .. 2008-05-25 15:15:53 |
..also seen from the raised track 2008-05-25 15:16:03 |
The height of the exhaulst shows Jims effort on the new line 2008-05-25 15:16:07 |
Through the long narrows 2008-05-25 15:17:46 |
Jim climbs up past the carpark 2008-05-25 15:29:05 |
2008-05-25 15:43:06 |
| | | |